BRADLEY HALL
Location: WIGAN

CLIENT:
INDURENT
‍
‍Project Value: £20K

We successfully delivered a targeted refurbishment and compliance project at Unit S16 Bradley Hall, transforming the existing industrial unit into a clean, compliant and versatile space suitable for a range of future occupiers.
‍
The project focused on landlord compliance and white box works, providing a refreshed internal environment while upgrading key building systems to meet required standards.

The completed refurbishment has enhanced the quality, functionality and flexibility of the unit, creating a modern space suitable for light industrial, manufacturing, trade counter, retail warehouse and secure storage uses.

PROJECT SCOPE

The refurbishment works were designed to reinstate the unit, improve compliance and create a high-quality working environment. Our works included:
  • Full strip-out of existing fixtures and finishes
  • Preparation and decoration of walls throughout using RAL 9010 Pure White paint
  • Floor preparation, grinding and application of anti-slip coating in RAL 7001 Silver Grey
  • Refurbishment of office, toilet and mezzanine areas
  • Electrical Installation Condition Report (EICR)
  • Installation and testing of emergency lighting
  • Installation and certification of a BS5839 compliant fire alarm system
  • Roller shutter certification and seal replacement
  • Installation of fire signage and replacement of locks
The project was delivered under a JCT Minor Works Contract over a two-week programme, with careful coordination ensuring all works were completed efficiently and in line with Indurent’s requirements.

PROJECT HIGHLIGHTS

Landlord ComplianceThe refurbishment successfully addressed key compliance requirements, ensuring the unit met current standards and was prepared for future occupation.

Improved Facility StandardsInternal finishes, upgraded flooring and refreshed areas throughout the unit have created a cleaner, more professional environment for future users.

Enhanced Safety MeasuresThe installation and certification of fire alarm systems, emergency lighting and associated safety measures improved the overall compliance and usability of the building.

Efficient DeliveryWorking within a short two-week programme, we carefully coordinated all activities to deliver the works safely, efficiently and to the required specification.

Flexible Future UseThe completed refurbishment has provided a versatile industrial space suitable for a range of occupier requirements, improving the unit’s long-term appeal and market readiness.